摘要 某大型市政桥梁为双转体现浇梁,转体施工是该项目的重要环节。对此阐述该项目上下球铰、滑道、撑脚、底膜等的安装,并进行转体系统检测和转动实验,使施工最终达到设计要求,打好项目施工基础,同时为类似工程提供参考。 A large-scale municipal bridge is a double revolving body cast-in-place beam,revolving construction is an important link of the project.This paper explores the installation of the lower ball hinge and slide,the installation of the upper ball hinge and supporting foot,pouring the turntable concrete,and testing the rotating body system and rotating experiments.The design requirements for the construction of double-rotating cast-in-place beam is realized and reference to similar projects can be derived.
作者 王洁 WANG Jie(The 5th Engineering Co.,Ltd.of China Railway 18th Bureau,Tianjin 300459,China)
出处 《广东水利电力职业技术学院学报》 2020年第3期26-29,共4页 Journal of Guangdong Polytechnic of Water Resources and Electric Engineering
关键词 转体桥 转体系统 球铰 上下盘砼 关键施工技术 rotating system lower ball joint support foot installation pouring testing
  • 相关文献

参考文献6

二级参考文献10

共引文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部