摘要
随着新型冠状病毒肺炎疫情的爆发和肆虐,根据实际情况快速、高效地建设防疫医院具有较高的紧迫性和必要性。论文结合西安市公共卫生中心应急院区的设计与建设实践,介绍了限期建成一座合格传染病医院的设计及施工的重要环节,全面揭示了西安防疫医院的全装配式建造难点,对积累快速建造传染病医院的设计施工经验,提升建造服务水平具有一定的参考意义。
With the outbreak and ravage of COVID-19,it is urgent and necessary to build epidemic prevention hospitals quickly and efficiently according to the actual situation.Combined Xi’an public health emergency on campus at the center of the design and construction practice,this paper introduces the build up a qualified hospital of infectious diseases within a time limit of an important link of the design and construction,fully reveals the hospital total prefabricated construction difficulties and xi'an epidemic prevention for rapid construction of the infectious disease hospital design and construction experience,promote to build service level has certain reference significance.
作者
罗朝洪
唐恩宽
杨小龙
LUO Chaohong;TANG Enkuan;YANG Xiaolong(ChinaSate Construction Silk Road Construction Investment Group Co.,Ltd.,Xian Shaanxi 710200,China;China Construction Fifth Engineering Division Co.,Ltd.,Changsha Hunan 410004,China)
出处
《工程质量》
2020年第10期99-102,共4页
Construction Quality
关键词
装配式
负压病房
密封消毒
洁污分流
prefabricated
negative pressure ward
sealed disinfection
clean and dirty separation