大型重力式码头后轨基础沉降控制 被引量:2

Control of Settlement of Rear Rail Foundation for Large-size Gravity Berth
下载PDF
导出
摘要 针对某煤炭码头后轨结构设计采用回填开山石基础,沉降控制要求高的问题,从严控填料质量、优化强夯点布置以及提前预留沉降和高配可调系统等四个方面进行了施工精细化管理,实现了大型重力式码头后轨基础沉降的有效控制,取得了良好的项目效益,突破了大型重力式码头后轨通常采用桩基础的限制,为以后类似工程设计和施工提供参考依据。 In the design of rear rail structure of a coal terminal,rock-filled foundation requires high control of settlement.A detailed management of construction is carried out through strict quality control of the filled rocks,optimized layout of dynamic compaction points,the quantity of settlement reserved in advance and highly adjustable system.The above work effectively controls the settlement of the rear rail foundation of large-size gravity berth and achieves project benefit.The research results show that pile foundation is able to be replaced with rock-filled foundation as the rear rail foundation of large-size gravity berth,which will serve as a reference for the design and construction of similar projects.
作者 侯勇 魏建雄 宋兰芳 Hou Yong;Wei Jianxiong;Song Lanfang(CCCC-FHDI Engineering Co.,Ltd.,Guangzhou Guangdong 510230,China)
出处 《港工技术》 2020年第5期51-54,共4页 Port Engineering Technology
关键词 大型重力式码头 后轨基础 沉降控制 夯点布置 large-size gravity berth rear rail foundation settlement control layout of compaction points
  • 相关文献

参考文献6

二级参考文献5

  • 1JTJ290-98.重力式码头设计与施工规范[S].[S].,..
  • 2北京土木建筑学会.地基与基础工程施工技术措施[M].北京:经济科学出版社,2005.
  • 3JTJ248-2001,港口工程灌注桩设计与施工规范[S].
  • 4港口工程施工手册[M].人民交通出版社,1994.
  • 5范祥水,钟广明.强夯法在码头门机轨道地基加固中的应用[J].水运工程,2002(11):51-54. 被引量:3

共引文献14

同被引文献13

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部