本文主要介绍中国电建港航公司承接帕德玛河道整治项目,采用一整套机械化自动化的大型水上土工砂袋装填及定位下沉施工工艺,达到安全生产、施工高效、精度可控、覆盖均与、节约成本,可为国内外类似工程施工提供参考。
In Padma waterway regulating works undertaken by POWERCHINA Harbor Co.,Ltd.,a whole set of mechanical and automatic construction technology has been used,including the filling,positioning and dumping of large geo-bags.This technology guarantees safe production,high-efficiency construction,controllable precision,even coverage and cost saving,and serves as a reference for similar projects in China and abroad.
作者
周林
于学付
张雪娇
Zhou Lin;Yu Xuefu;Zhang Xuejiao(POWERCHINA Harbor Co.,Ltd.,Tianjin 300467,China)
出处
《港工技术》
2020年第5期99-102,共4页
Port Engineering Technology
关键词
大型土工砂袋
施工工艺
覆盖均与
经济效益
large geo-bags
construction technology
even coverage