摘要
文章以已经实施完成并取得效果的汶上县泉河上游段综合治理工程中的堤路设计为例,简单分析了堤路结合设计中需要考虑的选线原则、平面走线选取、横断面型式选取、堤路路面高程选取、筑堤材料及填筑方案以及新老堤路结合处理等方案,群众反馈实施效果较好,为后期河道治理中的堤路结合设计提供了参考依据。
The road embankment design in comprehensive treatment project at the upper reaches of Quanhe River of Wenshang County is adopted as an example in the paper,wherein the design has been implemented with achievements.The route selection principle,plane route selection,cross sectional type selection,embankment elevation selection,embankment materials,filling solutions,combination of old and new road embankment treatment,etc.requiring consideration in road embankment combined design are simply analyzed.The implementation effect fed back by the masses are better,thereby providing design reference basis for embankment combined design in subsequent river treatment.
作者
张敏
刘淑萍
ZHANG Min;LIU Shuping(Shandong Survey and Design Institute of Water Conservancy, Jinan 250013, China;Shandong Hydraulic Engineering Construction Quality and Safety Center, Jinan 250013, China)
出处
《中国水能及电气化》
2020年第9期23-26,共4页
China Water Power & Electrification
关键词
堤路结合
河道治理
公路设计
应用分析
road embankment combination
river regulation
highway design
application analysis