大型斜拉桥转体施工定位测量技术 被引量:7

Measurement Technique of Swivel Construction of Cable-stayed Bridge with Long Span
下载PDF
导出
摘要 菏泽市丹阳立交桥全长2032 m,在京九铁路交汇处附近采用跨径组合为(38+102+240+102+38)m斜拉桥转体上跨,同时以转体斜拉长度238 m、转体重量2.48万t、钢球铰直径4.5m创造当时转体桥梁单转结构长度、重量及钢球铰直径3项记录.本文对该桥转体施工所采用的关键测量技术做了详细阐述,包括主桥施工控制网建立、球铰定位和滑道水平控制、斜拉索索导管定位、梁体线形监控和转体过程控制,使得该桥平面、高程定位均得到有效控制,在转体桥梁施工测量控制中具有良好的推广应用价值. Danyang Flyover was located in Heze City,Shandong Province,its total length was 2 032 m.The span combination of(38+102+240+102+38) m was used to cross the Beijing-Kowloon Railway.The plane rotation technology was used for the main span construction,the diagonal length was 238 m and its weight was 24 800 t.The diameter of steel ball hinge reached 4.5 m.The rotation structure length,weight and the size of steel ball hinge all made records at that time.With Danyang Flyover as a sample,the paper showed the key measuring technologies during bridge rotation construction,which including the construction control network for main bridge,the fixed position of steel ball hinge,the control of slideway horizontal accuracy,the positioning measurement of stayed cable conduit,the monitoring of bridge alignment and the control accuracy in the rotation construction.Based on above key technologies,the construction accuracy of bridge plane and elevation positioning were effectively improved,the results of the paper were also helpful for the similar projects.
作者 仲维玲 ZHONG Weiling(China Railway 20^th Bureau Group Co.Ltd.,Xi'an Shaanxi 710016,China)
出处 《铁道建筑技术》 2020年第9期94-97,共4页 Railway Construction Technology
基金 中铁二十局集团有限公司科技研发项目(J14-01B)。
关键词 大型斜拉桥 转体 定位 测量 cable-stayed bridge with large span rotation positioning measurement
  • 相关文献

参考文献12

二级参考文献40

共引文献122

同被引文献51

引证文献7

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部