期刊文献+

综采设备安装与回撤过程中双速绞车的应用分析

Application of Double Speed Winch in Installation and Retraction of Fully Mechanized Mining Equipment
下载PDF
导出
摘要 主要针对双速绞车在安装与回车过程中存在的绞车脱档、换挡齿轮磨损、联轴器损坏和轴承磨损等常见故障进行原因分析,并且进一步提出了解决措施与注意事项,为煤矿高效安全地对综采设备进行安装与回撤提供参考。 This paper mainly analyzes the causes of the common faults such as winch off gear, gear shift wear,coupling damage and bearing wear in the process of installation and return of double speed winch, and further puts forward the solutions and precautions, which provides a reference for the installation and withdrawal of fully mechanized mining equipment in coal mine.
作者 邱飞 Qiu Fei(Transportation Section of Yuwu Coal Industry Company,Shanxi Lu'an Group,Changzhi Shanxi 046103)
出处 《机械管理开发》 2020年第10期302-303,共2页 Mechanical Management and Development
关键词 综采设备 安装与回撤 双速绞车 fully mechanized mining equipment installation and withdrawal double speed winch
  • 相关文献

参考文献4

二级参考文献7

共引文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部