水利工程招标工程量清单常见问题探讨 被引量:3

Discussion on common problems existing in bid bill of quantities of water conservancy project
下载PDF
导出
摘要 从岩土级别、土石运距、混凝土模板、超挖和超填、细部结构、混凝土温控、暂估价项目、工程量清单与技术条款的对应关系等9个方面探讨了水利工程招标工程量清单中常见的问题,并针对这些问题,提出了编制水利工程招标工程量清单时的应对方法。 The author discussed the common problems existing in the bid bill of quantities of water conservancy project from 9 aspects of geotechnical grade,earth-rock transportation distance,concrete formwork,over excavation and overfill,detailed structure,temperature control of concrete,provisional valuation items,correspondence between bill of quantities and technical specification of bidding documents.In view of these problems,solution is put forward for preparation of bill.
作者 郭芳群 GUO Fang-qun(Guangxi Water&Power Design Institute Co.,Ltd.,Nanning 530023,China)
出处 《广西水利水电》 2020年第5期81-84,共4页 Guangxi Water Resources & Hydropower Engineering
关键词 招标工程量清单 单价合同 施工合同 计量与支付 水利水电工程 Bid bill of quantities unit price contract construction contract measurement and payment water conservancy and hydropower project
  • 相关文献

同被引文献22

引证文献3

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部