期刊文献+

舟岱跨海大桥索塔上横梁快速施工技术 被引量:5

Rapid Construction Technology of the Upper Crossbeam of the Cable Tower of Zhoudai Sea-crossing Bridge
下载PDF
导出
摘要 舟岱跨海大桥主桥索塔上横梁采用牛腿配合钢管支架及预制型钢支架技术进行快速施工,对牛腿、钢管支架及型钢支架进行建模分析,对各构件受力进行计算及复核,对上横梁施工支架快速加工及安装进行说明。工程实践表明,主桥索塔上横梁快速施工技术可缩短主线工期,提高施工安全性,具有一定经济效益。 The upper crossbeam of the main bridge cable tower of Zhoudai Sea-crossing Bridge adopts corbels combined with steel pipe brackets and prefabricated section steel brackets technology for rapid construction. This paper models and analyzes corbels,steel pipe brackets and section steel brackets,calculates and reviews the stress of each component,and explains the rapid processing and installation of the upper crossbeam brackets. Engineering practice shows that the rapid construction technology of the upper crossbeam of the main bridge cable tower can shorten the main line construction period,improve construction safety,and have certain economic benefits.
作者 雷栋 刘健 张敏 LEI Dong;LIU Jian;ZHANG Min(Road and Bridge International Co.,Ltd.,Beijing 100027,China;Road and Bridge East China Engineering Co.,Ltd.,Shanghai 201203,China)
出处 《施工技术》 CAS 2020年第15期41-43,共3页 Construction Technology
基金 中交路桥建设有限公司科技研发项目:海洋环境大曲率索塔快速施工技术研究(ZJLJ-2019-16)。
关键词 桥梁工程 上横梁 支架 预制 快速施工 有限元分析 bridges upper crossbeams brackets prefabricated rapid construction finite element analysis