摘要
本文针对商合杭高铁接触网工程相关施工工艺提出建议方案,分析提高接触网运行品质和安全可靠性的措施,并结合实际工程对应用效果进行了测试,结果表明所提出的改善措施能够提高接触网性能,优化弓网受流质量。
The paper puts forward suggestions and schemes for related construction process for OCL engineering of Shang-He-Hang high speed railway,analyzes the measures for improvement of operational quality,safety and reliability of OCL.The application results are tested with connection of actual project,and the results show that the proposed measures are able to improve the OCL properties and optimize the current collection quality of pantograph-catenary system.
出处
《电气化铁道》
2020年第5期55-58,共4页
Electric Railway
关键词
高铁接触网
施工质量
弓网关系
改善措施
high speed OCL
construction quality
pantograph-catenary interaction
measures for improvement