摘要
以电网建设全寿命周期环境管理工作为研究对象,将电网建设按照实施顺序分为规划设计阶段、施工阶段和运行阶段,提出了各阶段环保管家清单式服务内容。以运行阶段为例,细化了每一项服务清单的主要服务细则及操作方法,并结合监管要求提出定制化环保服务理念。
This paper took the whole life cycle of environmental management work of power grid construction as the research object,and divided the power grid construction into planning and design phase,construction phase and operation phase,with environmental protection butler list service for each phase.Taking the operation stage as an exampleh service list were much cleared,the main service details and operation methods of eac th,and the customized environmental protection service concept was proposed in conjunction withe regulatory requirements.
作者
张体强
陈迪
王琳杰
Zhang Tiqiang;Chen Di;Wang Linjie(Sichuan Electric Pouwer Design&Consuling Co.,Ltd.,Chengdu Sichuan 610041,China)
出处
《河北环境工程学院学报》
CAS
2020年第5期22-25,共4页
Journal of Hebei University of Environmental Engineering
关键词
电网建设
环保管家
环境管理
服务清单
power grid construction
environmental protection bulter
environmental management
service list