载人提升系统在白鹤滩水电站竖井施工中的应用 被引量:3

Application of Manned Lifting System in Shaft Construction at Baihetan Hydropower Station
下载PDF
导出
摘要 白鹤滩水电站左岸引水发电系统包含28条深大竖井,总开挖深度约3600 m,总井挖量约41万m 3,具有深度深、断面大、相邻距离近、地质条件复杂、施工安全风险高等特点。为确保竖井施工安全,白鹤滩水电站左岸深大竖井群施工采用新型载人提升系统作为竖井内施工人员上下交通的主要工具。该系统具有稳定可靠、操作简便、智能安全等特点,介绍了其在工程中的应用情况。 The diversion power generation system on the left bank of Baihetan Hydropower Station consists of 28 deep and large shafts with a total excavation depth of 3600m and a total excavation volume of 410,000m3.It has the characteristics of deep depth,large section,close proximity,complex geological conditions and high construction safety risks.In order to ensure the safety of shaft construction,a new type of manned lifting system is adopted as the main tool for the construction personnel to get up and down in the shaft.The system has the characteristics of stability,reliability,easy operation and intelligent security.This paper introduces its application in engineering.
作者 齐磊 方善新 王涛 QI Lei;FANG Shanxin;WANG Tao(Sinohydro Bureau 7 Co.,LTD,Chengdu,Sichuan,610213)
出处 《四川水力发电》 2020年第5期57-60,共4页 Sichuan Hydropower
关键词 竖井 载人提升系统 应用 白鹤滩水电站 shaft manned lifting system application Baihetan Hydropower Station
  • 相关文献

参考文献5

二级参考文献11

共引文献14

同被引文献11

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部