期刊文献+

BIM技术在526国道改建工程建管养全过程中的应用 被引量:3

Application of BIM Technology in the Whole Process of Construction,Management and Maintenance of 526 National Highway Reconstruction Project
下载PDF
导出
摘要 随着BIM技术的发展,BIM技术已逐渐应用到工程的建管养全过程,通过建立BIM应用实施整体架构体系,并对其进行深度模型设计后,可充分应用于工程勘察、施工图设计、施工阶段的方案优化、施工技术指导、安全管理、质量管理、成本管理、进度管理、运行维护阶段的设备管理及信息快速查询等。更好地满足公路工程建管养全过程的管理。介绍了BIM技术在526国道改建工程建管养全过程中的应用。 With the development of BIM technology,BIM technology has been gradually applied to the whole process of project construction,management and maintenance.Through the establishment of the overall architecture system of BIM application and implementation,and after its in-depth model design,it can be fully used in engineering survey,construction drawing design,scheme optimization in construction stage,construction technology guidance,safety management,quality management,cost management,schedule management,equipment management and information quick query in operation and maintenance stage.It better meets the management of the whole process of construction,management and maintenance of highway engineering.It introduces the application of BIM technology in the whole process of construction,management and maintenance of 526 National Highway Reconstruction Project.
作者 尹成福 陈小锐 YIN Chengfu;CHEN Xiaorui(Sinohydro Bureau 5 Co.,LTD,Chengdu,Sichuan,610066)
出处 《四川水力发电》 2020年第5期118-121,130,共5页 Sichuan Hydropower
关键词 BIM技术 建管养 全过程 应用 BIM technology construction,management and maintenance whole process application
  • 相关文献

参考文献1

共引文献36

同被引文献12

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部