1B. A. G. Bossink, H. J. H. Brouwers. Construction waste: quantification and source evaluation[J].Journal of Construction Engineering and Management, 1996,122( 1 ):55-60.
2Carlos T. Formoso, Lucio Soibelman, Claudia De Cesare, Eduardo L. Isatto. Material waste in building industry: main causes and prevention [J]. Journal of Construction Engineering and Management ,2002,128(4):316-325.
3Chi Sun Poon, Ann T. W. Yu, L. Jaillon. Reducing building waste at construction sites in Hong Kong [J]. Construction Management and Economic, 2004(22):675- 689.
4Vivian W.Y.Tam, L.Y. Shen, C.M. Tam. Assessing the levels of material wastage affected by sub-contracting relationships and projects types with their correlations [J]. Building and Environment,2007(42):1471-1477.
5WangJ Y, Yuan H P, Kang X P, et al. Critical success factors for on-site sorting of construction waste: A China studyj.I], Resources, Conservation and Recycling, 2010, 54: 931-936.
6Osmani M, GlassJ, Price A. Architects' perspectives on construction waste reduction by design[J]. Waste Man?agement, 2008,28: 1147-1158.
7Teo M, Loosermore M. A theory of waste behavior in the construction industry[J]. Construction Management and Economics, 2001, 19: 741-75l.
8HaoJ L, Hills M, Shen L Y. Managing construction waste on-site through system dynamics modeling: The case of Hong Kong[J]. Engineering, Construction and Architectural Management, 2008, 15(2): 103-113.
9Yuan H P, Shen L Y. Trend of the research on construction and demolition waste management[J]. Waste Man?agement, 2011, 31(4): 670-679.
10Mills T H, Showalter E,Jarman D. A cost effective waste management plan[J]. Cost Engineering, 1999, 41(3): 35-43.