摘要
通过分析武汉市长江武昌岸古河道沉积物地层特殊的水文地质条件、岩土工程性质和对地铁车站基坑工程的影响,并结合地铁车站基坑工程实例,提出了该古河道的分布区域内的地铁车站基坑设计、施工及监测方面的建议,为类似基坑工程提供参考借鉴。
Based on the analysis of the special hydrogeological conditions,geotechnical engineering properties and the influence on the foundation pit engineering of the Changjiang River in Wuhan,China,combined with the successful experience of groundwater treatment in the ancient river stratum in the foundation pit project of the subway station,some suggestions on the design,construction and monitoring of the foundation pit of the subway station in the distribution area of the ancient river channel in Wuchang Bank are put forward,it provides reference for similar foundation pit engineering.
作者
唐凌璐
唐传政
Tang Linglu;Tang Chuanzheng(Hubei Key Laboratory of Earthquake Early Warning,Hubei Earthquake Agency,Wuhan 430000,China;Wuhan Institute of Earthquake Engineering Co.,Ltd.,Wuhan 430000,China;Wuhan Municipal Engineering Quality Supervision Station,Wuhan 430015,China)
出处
《城市勘测》
2020年第5期192-196,共5页
Urban Geotechnical Investigation & Surveying
关键词
古河道
工程特性
基坑影响
地铁工程
ancient river course
engineering properties
foundation pit effect
metro engineering