核电厂初可研阶段厂址专题研究要点浅析

Elementary Analysis on Main Points of Special Topic Research on Nuclear Power Plant Site in Preliminary Feasibility Study Stage
下载PDF
导出
摘要 通过对核电工程项目在初可研阶段开展的工作目的、工作流程以及厂址类地形测量、岩土勘察、地震评价、大件运输、气候气象、人口分布、外部事件、工程水文专题研究的工作要点进行论述,提出了本阶段工作的注意事项和重点,对指导后续工作实践具有重要意义。 This paper discussed the main points of the research on the work purpose,work flow,and topographic survey,geotechnical survey,seismic evaluation,large-scale transportation,climatic and meteorological,population distribution,external events,engineering hydrology carried out in the preliminary feasibility study stage of nuclear power engineering projects,and put forward the notes and key points of the work at this stage,which was of great significance to guide the follow-up work practice.
作者 白凯 BAI Kai(China Nuclear Power Engineering Co.,Ltd.,Beijing 100840,China)
出处 《能源与节能》 2020年第10期55-57,共3页 Energy and Energy Conservation
关键词 核电厂 初可研 厂址选择 地震评价 大件运输 nuclear power plant preliminary feasibility study site selection seismic evaluation large-scale transportation
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部