摘要
通过对孟加拉国某净水厂至加压泵站输水管线的计算分析,需采取防水锤措施。在净水厂送水泵房设置液控蝶阀以及管线设置复合式排气阀之后,水锤现象得到了有效控制,达到了预期效果。
After modeling analysis of the pipeline,it was judged that anti-water hammer measure was necessary.While hydraulic control butterfly valve and air valve was utilized,water hammer would be controlled well,reaching the anticipated result.
作者
巨志剑
师永健
车爱伟
胡坤
张润喜
唐翀鹏
Ju Zhijian;Shi Yongjian;Che Aiwei;Hu Kun;Zhang Runxi;Tang Chongpeng(CSCEC AECOM Consultants Co.,Ltd.,Lanzhou 730000,China;China CAMC Engineering Co.,Ltd.,Beijing 100080,China)
出处
《给水排水》
CSCD
北大核心
2020年第9期119-122,共4页
Water & Wastewater Engineering
关键词
长距离输水管线
水锤计算
蝶阀
排气阀
孟加拉国
Long distance water transmission pipeline
Water hammer calculation
Butterfly valve
Air valve
Bangladesh