摘要 在文章论述中,主要是针对近接高铁车站,在基坑开挖的过程中,所产生的各类影响数值进行分析。在进行基坑开挖的过程中,为了保障地下空间的结构近距离下穿当中,进行安全高效的施工建设。其在结构方面,需要进行优化设计以及施工高质量的建设,从而保障不会对高铁车站造成严重的不良影响。 In the article's discussion,it is mainly to analyze the various impact values generated during the excavation of the foundation pit near the high-speed railway station.In the process of foundation pit excavation,in order to ensure that the structure of the underground space passes through it closely,safe and efficient construction is carried out.In terms of structure,it is necessary to optimize the design and construction of high-quality construction,so as to ensure that the station will not cause serious adverse effects.
作者 聂平太 Nie Pingtai(China Railway No.17 Bureau Group Fourth Engineering Co.,Ltd,Yuxi,Yunnan,653100,China)
出处 《智能城市应用》 2020年第6期1-3,共3页 Smart City Application
关键词 基坑开挖 近接高铁 监测结果 数值模拟 foundation pit excavation proximity to high-speed railway monitoring results numerical simulation
  • 相关文献

参考文献1

二级参考文献8

共引文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部