摘要
随着工艺逐渐成熟、成本大幅降低,铝合金模板开始在工程中大面积展开应用。文中作者将结合工程实例应用及自身工作经验总结,从方案选型、厂家确定及图纸深化加工、进场及模板首拼、施工进度管理等四个方面进行阐述其全过程管理要点,以最大限度的实现铝合金模板施工应用的综合效益。
With the gradual maturity of the technology and the substantial reduction of the cost,aluminum alloy formwork began to be widely used in engineering.In this paper,the author will combine with the application of engineering examples and the summary of their own work experience,from the scheme selection,manufacturer determination and drawing deepening processing,entering and formwork first assembly,construction schedule management and other four aspects to elaborate the whole process management points,so as to maximize the comprehensive benefits of aluminum alloy formwork construction and application.