摘要
1988年,改组后的中国院从建设部南配楼搬迁至车公庄大街19号院。在20多年的时间里,随着中国院的发展,大院内的办公建筑一直处在持续更新建设的状态,其中2000年建成2号办公楼,2002年建成3号办公楼,2010年进行了1号楼改造和外立面更新。2011年,院集团启动了中国院创新科研示范中心(以下简称"创新楼")的建设计划,选址是19号院西北角原食堂、篮球场、锅炉房的位置。不同于1-3号楼的单纯办公属性.
In 1988,the restructured China Architecture Design&Research Group(CADG)was relocated to No.19 Chegongzhuang Street from the southern annex building of Ministry of Construction.During the past 20 years,both newly-built and renovation projects were witnessed in the No.19 compound with the development of CADG,incuding the completion of 2#Office Building in 2000,the completion of 3#Office Building in 2002,and the renovation and upgrade of facade of 1#Office Building in 2010.In 2011,CCTC,the parent company of CADG,initiated the construction plan for the CADG.Innovation&Scientific Research Demonstration Centre(short as Innovation Centre hereinafter),which would be located at the northwestern corner of the No.19 Compound where the former canteen,basketball court and boiler room was situated.Unlike the 1#,2#and 3#Offce Buildings mentioned above,the Innovation Centre wasplanned as a multi-functional office complex with the former functional spaces on site relocated in the building.Meanwhile,its openness to the city,a result of demolition of the enclosing wall of No.19 compound,must be complemented with its highly comprehensive functional prgramming.
作者
柴培根
周凯(摄影)
张广源(摄影)
李季(摄影)
马海
刘鹏
田海鸥
任玥
李颖
李楠
张东
杨文斌
娄莎莎
戴天行
CHAI Peigen;ZHOU Kai;ZHANG Guangyuan;LI Ji;MA Hai;LIU Peng;TIAN Haiou;REN Yue;LI Ying;Li Nan;ZHANG Dong;YANG Wenbin;LOU Shasha;DAI Tianxing(Tianjin University;China Architecture Design&Research Group;U2 Studio,UD Center;Tsinghua University;不详)
出处
《世界建筑》
2020年第10期62-69,136,共9页
World Architecture