期刊文献+

洞口二号大桥桥型方案设计比选

Comparison and selection of bridge type scheme design of Dongkou No.2 bridge
下载PDF
导出
摘要 综合考虑桥位处地形地貌、地质、路线、施工方法、高压铁塔等因素,对洞口二号大桥提出了三种方案进行桥型比选。详细比较了其中两种可行方案的优缺点,最终采用预应力混凝土连续梁方案,为类似桥梁方案设计提供了参考。 Considering topography,geology,route,construction method,high-voltage tower and other factors,three schemes for bridge type comparison of Dongkou No.2 Bridge were put forward.The advantages and disadvantages of two feasible schemes were compared in detail.The prestressed concrete continuous beam scheme was finally adopted.This project provided a reference for similar bridge scheme design.
作者 吴骏 李红霞 Wu Jun;Li Hongxia(Guizhou Institute of Technology,Guiyang 550003,China;Guizhou Construction Science Research&Design Institute Limited Company of CSCEC,Guiyang 550006,China)
出处 《山西建筑》 2020年第21期130-131,161,共3页 Shanxi Architecture
关键词 连续梁 预应力 方案比选 continuous girder bridge prestressed comparison of bridge programmes
  • 相关文献

参考文献2

二级参考文献1

  • 1交通部公路司.降低造价公路设计指南[M].北京:人民交通出版社,2005.

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部