LW60-H31JH井是辽河油田实施的一口侧钻水平井。该井由辽河油田分公司钻井设计中心负责工程设计,承担该井施工的队伍是长城钻探钻井三公司,工程院项目组负责造斜段和水平段的工程和泥浆技术支持工作。通过细化技术方案,认真组织施工,协调相关部门,紧密配合顺利完成了该井的施工。
LW60-H31 JH well is a lateral horizontal well in Liaohe oilfield. The well was designed by the drilling design center of Liaohe oilfield branch company. The team that undertook the well construction was the third company of Greatwall drilling and drilling company, and the project team of the engineering academy was responsible for the engineering and mud technical support for the inclined section and horizontal section. By detailing the technical plan, carefully organizing the construction, coordinating relevant departments, and working closely with each other, the well was successfully completed.
作者
唐亮
迟铁军
徐志伟
张东生
林愿聪
杨静
田静
TANG Liang;CHI Tie-jun;XU Zhi-wei;ZHANG Dong-sheng;LIN Yuan-cong;YANG Jing;TIAN Jing(Engineering Research Institute of Greatwall Drilling Company,Panjin Liaoning 124010,China;No.1 Drilling Company of Greatwall Drilling Company,Panjin Liaoning 124010,China;Safety and Environmental Protection Department of liaohe Oilfield Energy Management Company,Panjin Liaoning 124010,China;No.2 Drilling Company of Greatwall Drilling Company,Panjin Liaoning 124010,China)
出处
《辽宁化工》
CAS
2020年第9期1113-1114,1123,共3页
Liaoning Chemical Industry
关键词
水平井
钻井液
测斜
Horizontal well
Mud