摘要
工程进度计划的编制是水利水电工程项目管理的一项重要内容,它能有效地组织和管理施工过程中各个阶段的工作,从而保证工程项目能够顺利完工。鉴于水利水电工程施工的过程是动态的,施工过程中可能受到多种风险因素的影响,导致工程进度计划并不是一成不变的,而是需要根据实际情况进行实时调整,文章提出了一种结合挣值管理和进度计划风险分析的动态进度计划管理方法。
The hydraulic and hydropower construction of a project schedule is an important content of project management,which can effectively organize and manage working content of each stage in construction in order to ensure projects completed successfully.As the construction process is dynamic and may be affected by a variety of risk factors,the schedule plan is not unchangeable but should make the real-time adjustment according to the current situation.In this paper we provide a dynamic scheduling integrated of earned value management and schedule risk analyses.
作者
荆珑
王春柳
邹建锋
Jing Long;Wang Chunliu;Zou Jianfeng(Power China Guiyang Engineering Corporation Limited,Guiyang,G uizhou 550081)
出处
《工程技术研究》
2020年第17期186-188,共3页
Engineering and Technological Research
关键词
水利水电工程
工程管理
动态进度计划
控制绩效
hydraulic and hydropower engineering
project management
dynamic scheduling
controlling performance