盖挖逆作地铁车站CFST柱-RC梁双暗牛腿节点抗剪性能研究

Study on the Shear Behavior of CFST Column-RC Beam Double Dark Bracket Joints in Top-Down Covered Excavation Metro Station
下载PDF
导出
摘要 内蒙古呼和浩特轨道交通1号线大型换乘站新华广场站、2号线大学西街站及中山路站均采用盖挖逆作法施工。采用该种工法建造的地铁车站,钢管混凝土柱与车站楼板纵梁不能同期形成,二者后期连接对剪力高效、可靠的传递起关键作用。因此,梁柱节点设计时采用双梁—双暗牛腿的形式。但是,目前该种节点的抗剪性能、破坏形态和原理尚不明确,相关规范未给出明确的规定,亟待进一步研究。为此,文章采用室内试验针对该种节点的抗剪性能开展系统的研究。通过研究主要得到以下结论:下部环形牛腿承担的剪力始终大于上部环形牛腿,约为上部环形牛腿的2.4倍;裂缝贯通,梁发生剪切破坏,节点并未破坏,符合强节点弱构件的设计原则。 The large transfer station Xinhua Square Station of Line 1 and the University West Street Station and Zhongshan Road Station of Line 2,are using the method of top-down covered excavation in Inner Mongolia Hohhot rail transit.With this method,the concrete-filled steel tube column and the floor slab longeron of the station cannot be formed at the same time,and the late connection between them plays a key role in the efficient and reliable transmission of shear force.For this reason,the design of beam and column joints adopts the form of double beam and double dark cow leg.However,the shear resistance,the failure pattern and the principle of this kind of node are still unclear at present,and the relevant specifications have not given clear provisions,so it is urgent to further study.In this paper,the shear resistance of the joints is systematically studied by laboratory tests.Through the research,the following conclusions are drawn:The shear force undertaken by the lower annular leg is always larger than that of the upper annular leg,which is about 2.4 times larger;Fracture penetration,shear failure occurred in the beam,the node is not broken,in accordance wit h the design principle of strong nodes weak components.
作者 唐志勋 陈雾航 何彦荣 Tang Zhixun;Chen Wuhang;He Yanrong(School of Civil Engineering,Inner Mongolia University of Sc ience&Technology,Baotou,Inner Mongolia 014010;Beijing Urban Construction Design Institute Co.,Ltd.,Beiji ng 100000;China Railway 20th Bureau Group Co.,Ltd.,Lanzhou,Gansu 730050)
出处 《工程技术研究》 2020年第19期8-10,共3页 Engineering and Technological Research
关键词 钢管混凝土节点 抗剪性能 盖挖逆作法 ABAQUS concrete-filled steel tube joint the shear performance top-dow n covered construction method ABAQUS
  • 相关文献

参考文献5

二级参考文献24

  • 1萧岩,汪波,王光明.盖挖法和盖挖法施工[J].市政技术,2004,22(6):359-370. 被引量:39
  • 2王元湘.盖挖法在浅埋地铁车站施工中的应用[J].世界隧道,1995(5):2-11. 被引量:8
  • 3铁道第三勘察设计院.天津站交通枢纽工程初步设计第二篇轨道换乘中心工程第四册结构与防水[R].天津:铁道第三勘察设计院,2006.
  • 4中国工程建设标准化协会.CECS28:90钢管混凝土结构设计与施工规程[s].北京:中国计划出版社,1992.
  • 5中华人民共和国电力规划总院.DL/T5085-1999钢-混凝土组合结构设计规程[S].北京:中国电力出版社,1999.
  • 6江西省建设厅.DB36/J001-2007钢管混凝土结构技术规程[S].北京:中国计划出版社,2008.
  • 7GB50011-2001.建筑抗震设计规范.[S].,..
  • 8GB50010-2002.混凝土结构设计规范.[S].,..
  • 9DBJ13-51-2003.钢管混凝土结构技术规程.[S].福州,2003..
  • 10福建省工程建设标准委员会.DBJ13-51-2003钢管混凝土结构技术规程[S].福州:[s.n.],2003.

共引文献47

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部