正反井开挖施工技术在梅蓄电站下库闸门井上的应用 被引量:2

Application of Excavation Construction Technology of Positive and Reverse Wells in Lower Reservoir Gate shaft of Meicun Pumped Storage Power Station
下载PDF
导出
摘要 闸门井作为抽水蓄能电站项目上的关键,施工进度直接影响蓄水发电时间。利用正反井施工技术进行闸门井的开挖,具有施工进度快、安全风险小、节约成本的优势,为电站按期蓄水发电提供条件,给类似闸门井开挖施工提供参考。 As the key of pumped storage power station project,the construction progress of gate shaft directly affects the time of water storage and power generation.It has the advantages of fast construction progress,low safety risk and cost saving to excavate the gate shaft by using the construction technology of positive and negative wells,which provides conditions for the power station to store water and generate electricity on schedule,and provides reference for similar gate shaft excavation construction.
作者 张春洪 梁胜利 ZHANG Chunhong;LIANG Shengli(SINOHYDRO BUREAU 14 CO.,LTD,Kunming 650041,China)
出处 《广东水利水电》 2020年第10期43-49,共7页 Guangdong Water Resources and Hydropower
关键词 抽水蓄能电站 闸门井 正反井开挖 技术 pumped storage power station gate shaft excavation technology of positive and reverse shafts technology
  • 相关文献

参考文献7

二级参考文献10

共引文献16

同被引文献12

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部