摘要
伴随经济的高速发展,建设行业市场迎来了发展黄金期,需求量节节攀升,但由于各种主客观原因,项目投资成果并不尽如人意。尤其是市政工程项目工期长、要求高、影响面大、涉及因素之多、风险之高,即使是项目建设主体在开展项目前已做好了工程造价预算工作,但在实际情况下,也可能遭遇由于造价精准率不够而导致的项目投资成本增加,进而影响整个工程质量。基于此,文章以项目投资中控制超支的因素为切入点,对如何提高工程造价预算精准性进行探究并指出目前造价工作可能存在的问题,进而有针对性地提出控制的要点和改进措施,为改进实际工作提供参考。
With the rapid economic development,the construction industry market ushered in the development of the golden period,the demand is climbing,but due to various subjective and objective reasons,the project investment results are not satisfactory.In particular,the municipal engineering project has a long construction period,high requirements,a large impact area,many factors involved,and high risks.Even if the project construction main body has done the project cost budget work well before the project is launched,however,under the actual circumstances,may also encounter due to the cost accuracy rate is not enough to lead to the increase of project investment costs,and then affect the quality of the whole project.Based on this,the article takes the factors of controlling cost overruns in project investment as the starting point,probes into how to improve the accuracy of project cost budget,and points out the possible problems existing in the present cost work,furthermore,the control points and improvement measures are put forward to provide reference for the improvement of practical work.
作者
蒯敏贵
Kuai Mingui(Shanghai Shenyuan Engineering Investment Consulting Co.,Ltd.,Shanghai 200070)
出处
《工程技术研究》
2020年第15期171-172,共2页
Engineering and Technological Research
关键词
市政工程
项目投资
超支
工程预算
工程造价
municipal engineering
project investment
overspending
project budget
project cost