期刊文献+

综合防治水技术在立井井筒掘进中的应用 被引量:5

Application of Comprehensive Water Control Technology in Driving Vertical Shaft
下载PDF
导出
摘要 立井井筒掘进过程中产生涌水,水压较大,竖向裂隙较发育,注浆堵水难度大,严重影响施工安全和施工进度。通过采用综合防治水技术,严格执行“有疑必探、先探后掘”,采用防、堵、排、截的综合治理原则,实现了立井井筒过强含水层的安全、高效施工,同时取得了很好的经济效益。 Aiming at the serious influence of high water pressure,developmental vertical crack and difficult sealing grouting caused by water inflow on construction safety and progress in driving vertical shaft,the paper presents the comprehensive water control technology with principle of"detecting with doubt and driving before detecting"followed strictly together with"prevention,sealing,drainage and interception",which can realize the safety and efficient construction in crossing strong aquifer with good economic benefits.
作者 李红旗 Li Hongqi(Jinyuan Construction Co.,Ltd.,Zhengzhou,Henan 454000)
出处 《江西煤炭科技》 2020年第4期137-140,共4页 Jiangxi Coal Science & Technology
关键词 井筒 超前探注 掘进 安全 shaft advanced detection and grouting excavation safety
  • 相关文献

参考文献1

二级参考文献2

  • 1王壮飞.建筑施工手册,第2版[M].北京:中国建筑工业出版社,1988..
  • 2王冠儒.建筑施工技术[M].北京:中国建筑工业出版社,1980..

共引文献9

同被引文献39

引证文献5

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部