超深振冲碎石桩施工技术及应用 被引量:6

Construction Technology and Application of Ultra-deep Vibro-replacement Stone Columns
下载PDF
导出
摘要 金沙江上游拉哇水电站上游围堰地基覆盖层最大深度超过65 m,为保障围堰上下游堰坡和深基坑开挖边坡稳定安全,须对堰基采取加固处理措施。通过采用SV70碎石桩机和伸缩导杆连接振冲器,成功实现了65 m超深振冲碎石桩施工,是目前国内外大规模施工的最深振冲碎石桩。检测成果表明,在采取加固处理措施后,围堰基础明显改善了抗液化性能,提高了承载力和抗变形能力,振冲碎石桩透水性良好,为拉哇水电站围堰及深基坑边坡安全稳定提供了保障。 The maximum depth of the upstream cofferdam foundation overburden of Lawa Hydropower Station on the upper Jinsha River exceeds 65 m.In order to ensure the stability and safety of upstream and downstream slopes of cofferdam and deep foundation pit slope,the foundation of cofferdam must be reinforced.By using SV70 gravel pile machine and telescopic guide rod to connect vibroflotation device,the construction of 65 m ultra-deep vibro-replacement stone columns are successfully realized,which is the deepest vibro-replacement stone columns constructed on a large scale at home and abroad at present.The test results show that the anti-liquefaction performance,bearing capacity and deformation resistance of cofferdam foundation are obviously improved after the reinforcement measures are taken,and the vibro-replacement stone columns have good water permeability,which provide a guarantee for the safety and stability of cofferdam and deep foundation pit slopes of Lawa Hydropower Station.
作者 胡贵良 魏永新 刘保柱 邵增富 HU Guiliang;WEI Yongxin;LIU Baozhu;SHAO Zengfu(Huadian Jinsha River Upstream Hydropower Development Co.,Ltd.,Chengdu 610041,Sichuan,China;3rd Branch Company of Sinohydro Fondation Engineering Co.,Ltd.,Chengdu 610213,Sichuan,China;China Huadian Corporation Ltd.,Beijing 100031,China)
出处 《水力发电》 北大核心 2020年第11期76-80,共5页 Water Power
关键词 基础处理 振冲碎石桩 施工 质量监控 检测 拉哇水电站 foundation treatment vibro-replacement stone column construction quality control test Lawa Hydropower Station
  • 相关文献

参考文献1

二级参考文献2

共引文献3

同被引文献48

引证文献6

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部