摘要
水电工程建设征地移民安置规划设计是水电移民安置工作的龙头。伴随着黄河上游水电开发及建设征地移民安置工作的持续推进,黄河上游水电移民安置规划设计在近70 a的历程中,锐意进取,与时俱进,提出了符合时代要求及黄河上游实际的规划设计成果,为黄河上游水电开发及水电移民安置工作提供了强有力的、科学有效的支持。文章通过不同时期典型水电站移民安置规划设计过程分析,总结了水电移民规划设计的实践经验和发展创新,展示了西北院在黄河上游水电开发中变革精神和不朽功勋。
The planning and design of land acquisition and resettlement is crucial for hydropower project construction.With the development of hydropower and construction resettlement at the upper reaches of the Yellow River,the planning and design of resettlement at the upper reaches of the Yellow River has advanced with the times in the course of nearly 70 years,and a plan that meets the requirements of the times and the actual situation of the upper reaches of the Yellow River has been proposed.The design results have provided strong,scientific and effective support for hydropower development and hydropower resettlement in the upper reaches of the Yellow River.Through the analysis of the resettlement planning and design process of typical hydropower stations in different periods,the article summarizes the practical experience and development innovation of hydropower resettlement planning and design,and demonstrates the reform spirit and immortal contributions of NWE in the development of hydropower in the upper reaches of the Yellow River.
作者
赵社义
杨丽洁
ZHAO Sheyi;YANG Lijie(Powerchina Northwest Engineering Corporation Limited, Xi'an 710065,China)
出处
《西北水电》
2020年第5期1-7,共7页
Northwest Hydropower
关键词
水电工程
移民安置
规划设计
实践与创新
hydropower engineering
resettlement
planning and design
practice and innovation