±1100kV古泉换流站分系统调试关键技术优化与实践 被引量:2

Optimization and Practice of Key Technologies for Subsystem Debugging of±1100 kV Guquan Converter Station
下载PDF
导出
摘要 换流站分系统调试是工程启动运行前最后一道工序,是检验工程功能正确完备与否的关键工序。换流站分系统调试试验项目和类别繁多,涉及全站所有一次设备和二次设备。文章介绍了±1100 kV古泉换流站分系统几项关键调试项目的调试方法、技术原理和质量控制方法,为类似工程提供参考。 The subsystem debugging of converter is the last process before the start-up and operation of the project,and it is the key process to check whether the function of the project is correct and complete.There are various subsystem debugging test items and categories of the converter station,involving all primary equipment and secondary equipment of the whole station.The debugging methods,technical principles and quality control methods of several key commissioning items of the±1100 kV Guquan converter station sub-system were introduced to provide references for similar projects.
作者 杜琛瑀 孟进 王璐 DU Chenyu;MENG Jin;WANG Lu(Anhui Power Transmission and Distribution Engineering Co.,Ltd.,He Fei,230000,China;North China Electric Power University,Baoding 071003,China)
出处 《电工技术》 2020年第20期66-67,共2页 Electric Engineering
关键词 换流站 分系统调试 converter station sub-system debugging
  • 相关文献

参考文献4

二级参考文献15

共引文献11

同被引文献9

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部