换流站分系统调试是工程启动运行前最后一道工序,是检验工程功能正确完备与否的关键工序。换流站分系统调试试验项目和类别繁多,涉及全站所有一次设备和二次设备。文章介绍了±1100 kV古泉换流站分系统几项关键调试项目的调试方法、技术原理和质量控制方法,为类似工程提供参考。
The subsystem debugging of converter is the last process before the start-up and operation of the project,and it is the key process to check whether the function of the project is correct and complete.There are various subsystem debugging test items and categories of the converter station,involving all primary equipment and secondary equipment of the whole station.The debugging methods,technical principles and quality control methods of several key commissioning items of the±1100 kV Guquan converter station sub-system were introduced to provide references for similar projects.