针对变电站电气一次安装施工环节的各个难点进行详尽解析,在实践验证的基础上,对原有方法进行完善,力求削减成本,充分发挥现有资源的价值,提升安装效率。在某变电站项目的基础上,探析一次设备安装施工安全及质量控制工作。
The research analyzes the difficulties of primary installation in power substation,and perfect the original methods based on practice verification to reduce cost,give full play to available resources and promote installation efficiency.Based on a certain project of a power substation,the research explores the safety and quality control of primary installation in power substation.
作者
菅文志
邸海峰
Jian Wenzhi;Di Haifeng(State Grid Heilongjiang Shangzhi Electric Power Bureau Co. LTD., Harbin 150000, China)
出处
《黑龙江科学》
2020年第22期116-117,共2页
Heilongjiang Science
关键词
变电站
电气
一次设备安装
质量控制
Power substation
Electric
Primary installation