摘要
以变电站一次设备作为研究对象,具体分析在安装测试过程中可能出现的故障问题,并给出相应解决方案,确保变电站一次设备能够顺利完成安装,保证质量达到预期目标,为电力系统运行奠定坚实基础。
We regard the primary equipment in substation as the research objects,analyze the possible malfunction problems in installation testing,and propose countermeasures to ensure the success in the installation of primary equipment in substation,to guarantee the quality in satisfying expected aim,and to provide solid foundation for electric power system operation.
作者
张赫
王立志
Zhang He;Wang Lizhi(State Grid Heilongjiang Shangzhi Electric Power Bureau Co. LTD., Harbin 140000, China)
出处
《黑龙江科学》
2020年第22期126-127,共2页
Heilongjiang Science
关键词
变电所
一次设备
安装调试
施工
Substation
Primary equipment
Installation and debugging
Construction