3Zheng X.All opportunity-triggered replacement policy for multiple-unit systems[J].IEEE Trans Reliab,1995,44 (4):648-652.
4Legat V,Zaludora AH,Cervenka V,et al.Contribution to optimization of preventive replacement[J].Reliab Engng Syst Safety,1996,51(3):259-266.
5Wang K S,Tsai Y T,Lin C H.Study of replacement policy for components in a mechanical system[J].Reliab Engng Syst Safety,1997,58(3):191-199.
6Nakagawa T.Sequential imperfect preventive maintenance policies[J].IEEE Trans Reliab,1988,37 (3):536-542.
7Chan J,Shaw L.Modeling repairable systems with failure rates that depend on age and maintenance[J].IEEE Trans Reliab,1993,42(4):566-571.
8Martorell S,Munoz A,Serradell V.Age-dependent models for evaluating risks and costs of surveillance and maintenance of systems[J].IEEE Trans Reliab,1996,45(3):433-441.
9Martorell S,Sanchez A,Serradell V.Age-dependent reliability model considering effects of maintenance and working conditions[J].Reliab Engng Syst Safety,1996,64(1):19-31.
10Tsai Y T,Wang K S,Tsai L C.A study of availability-centered preventive maintenance for multi-component systems[J].Reliab Engng Syst Safety,2004,84 (3):261-270.