镇安抽水蓄能电站针梁台车衬砌底部气泡控制措施探讨

Discussion on Bubble Control Measures at the Bottom of the Lining of Needle Beam Jumbo in Zhenan Pumped Storage Power Station
下载PDF
导出
摘要 以镇安抽水蓄能电站泄洪排沙洞圆形隧洞针梁台车衬砌为例,通对针梁底部衬砌砼气泡成因进行分析,结合工程实际,实施相应的控制措施,有效地控制了底部气泡发生,在后期衬砌施工的底部,气泡发生率和气泡面积降低效果明显,减少了后期缺陷处理的费用。 Taking the lining of the needle bea m jumbo in the circular tunnel of the flood discharge tunnel of Zhen'an Pumped Storage Power Station as an example,the cause of formation of the concrete bubbles at the bottom of the needle b e a m is analyzed.And the corresponding control measures are implemented according to the actual project.The generation of bubbles at the bottom is controlled.At the bottom of the later lining construction,the effect of reducing the incidence of bubbles and the area of bubbles is obvious,which reduces the cost of later defect treatment.
作者 侯娟 Hou Juan(China Hydropower Construction Group Tenth Engineering Bureau Co.,Ltd,Xi'an 710065,Shaanxi)
出处 《陕西水利》 2020年第11期141-142,145,共3页 Shaanxi Water Resources
关键词 针梁 底部 气泡 措施 Needle beam bottom bubbles measures
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部