摘要 为了解决电商销售带来的大幅度需求波动以及物料供应紧张造成的生产不确定性,对目前的生产瓶颈SMT波峰工艺采用线平衡改善、单元生产、混合生产以及人机配合等多种改善手段,重点强化生产线的生产能力和柔性对应两方面的能力,最终建立一个相对完善的整体生产系统。通过改造,该工程在产能和柔性上得到较大幅度的提高,能快速响应顾客需求的变化。 In order to solve the production uncertainty caused by large demand fluctuation and material supply shortage caused by e-commerce sales,various improvement measures such as line balance improvement,unit production,mixed production and man-machine cooperation were adopted for the current production bottleneck SMT wave crest process.Focusing on strengthening the production capacity and flexible corresponding capacity of the production line,a relatively perfect integration body production system was established.Through the transformation,the production capacity and flexibility of the project have been greatly improved,which can quickly respond to the change of customer demand.
作者 吴绍明 李伊 Wu Shaoming;Li Yi(Panasonic Wanbao Appliances Beauty and Living(Guangzhou)Co.,Ltd.,Guangzhou 511495,China)
出处 《机电工程技术》 2020年第10期84-88,192,共6页 Mechanical & Electrical Engineering Technology
关键词 需求波动 物料供应紧张 SMT波峰工艺 柔性生产 线平衡改善 demand fluctuations tight supply SMT wave process flexible production line balance
  • 相关文献

参考文献2

二级参考文献11

  • 1兰秀菊,陈勇,汤洪涛.SMT生产线平衡的持续改善方析[J].工业工程与管理,2006,11(2):109-111. 被引量:49
  • 2Watanabe T, Hashimoto Y, Nishikawa I, etc. Line balancing using a genetic model [ J ]. Control Eng. Practice, 1995,3( 1 ) :69-76.
  • 3Ciobanu G. A branch-and-bound algorithm to solve an assembly line balancing problem [ J ]. Economic Computation and Economic Cybernetics Studies and Research,1977, (4) :69-79.
  • 4Pang Chuan-Chen. An heuristic method for manufacturing assembly line balancing [ J]. Western Elecric Engineer,1975,19(4) :36-45.
  • 5Bhattacharjee T K. A heuristic approach to general assembly line balancing [ J ]. International Journal of Operations & Production Management, 1988,8 (6) :67 -77.
  • 6Rubinovitz J, Levitin G. Genetic algorithm for assembly line balancing[J]. Int. J. Production Economics,1995,41:343-353.
  • 7Arcus A L. COMSOAL: a computer method for sequencing operations for assembly lines [ J ]. International Journal of Production Research, 1966,4 (4) : 259-277.
  • 8Ronald G Askin,Charles R Standridge. Modeling and analysis of manufacturing systems[M]. Library of Congress Cataloging in Publication Data, 1993:31-38.
  • 9易树平,郭伏.基础工业工程[M].北京:机械工业出版社,2007.
  • 10杨洁丹,汤铁装,李卫荣,刘伟光.生产线均衡改进研究[J].绿色科技,2011,13(3):180-183. 被引量:10

共引文献20

同被引文献25

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部