期刊文献+

广西调峰辅助服务市场实时运行应急处置策略研究 被引量:2

Research on the Emergency Response Strategies for the Real-time Operation of Peak Load Regulation Auxiliary Service Market in Guangxi
下载PDF
导出
摘要 广西作为清洁能源装机占比较高的省份,正在不断推进调峰辅助服务市场建设。为了确保调峰辅助服务市场下的电网安全稳定运行,针对调峰辅助服务市场在运行过程中可能出现的调峰系统支持平台异常、出清结果异常、边界条件异常、调峰切换异常、电网突发故障等5类异常情况,结合电网实际情况及调度运行经验,给出了应急处置策略。 As a province with relatively high installed capacity of clean energy,Guangxi is constantly improving the construction of the peak load regulation auxiliary service market.In order to ensure the secure and stable operation of the power grid in the peak load regulation auxiliary service market,and aimed at handling five types of anomalies that may occur during the operation of the peak load regulation auxiliary service market including the abnormal support platform of the peak load regulation system,the abnormal clearing results,the abnormal boundary conditions,the abnormal peak load regulation switching and sudden power grid faults,emergency response strategies are proposed combined with the actual situation of the power grid and the dispatching operation experience.
作者 宁阳天 李培恺 宋吉峰 张旻钰 陈新凌 NING Yangtian;LI Peikai;SONG Jifeng;ZHANG Minyu;CHEN Xinling(Power Dispatching Control Center,Guangxi Power Grid,Guangxi Nanning 530023,China)
出处 《广西电力》 2020年第5期46-50,共5页 Guangxi Electric Power
关键词 电力市场 调峰辅助服务 出清 应急处置 power market peak load regulation auxiliary service clearing emergency response
  • 相关文献

参考文献2

二级参考文献20

共引文献48

同被引文献20

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部