摘要 清水江旁海航电枢纽水闸主体结构横跨于范围宽且深厚的断层破碎带或影响带,构造岩体破碎、力学强度低,对建筑物抗滑稳定较为不利。当采用常规灌浆方式进行地基处理时难以进浆,经现场试验研究,提出一种以“浓浆挤密、分段灌入、逐段控制压力”为原则的“脉冲式”的灌浆方法。声波测试表明,该灌浆方法效果良好,能够有效提高基础的整体性。结合固结灌浆孔的布置,在基础和建筑物之间设置锚筋桩,利用锚筋桩的工作机理,较大幅度提高了建筑物的抗滑安全系数。结合现场实施过程,固结灌浆结合锚筋桩的处理方式更为快速、经济,解决了建筑物抗滑稳定性的问题,达到了期望的效果。 The main structure of sluice spans a wide and deep bedrock fault fracture zone or influence zone in Panghai navigation-hydropower junction by the Qingshui River.The anti-sliding stability of the building is unfavorable due to broken structure and low mechanical strength of rock mass.It is difficult to grout when the traditional grouting method is used.Through the experiments,a pulsed grouting method based on the principle of“dense grout compaction,stage grouting and controlling pressure by section”is proposed.Sonic test shows that this grouting method has good effect and can effectively improve the integrity of foundation.Combined with the arrangement of consolidation grouting holes,anchor piles are set connecting the foundation and building.The safety coefficient of anti-sliding of sluices is improved considerably by the working mechanism of anchor piles.Through the practical implementation process,the ground treatment of consolidation grouting combined with anchor piles is confirmed more rapid and economical,which solves the problem of building anti-slip stability of the sluices and achieves the desired effect.
作者 凌威 任启江 王能 印术宇 LING Wei;REN Qi-jiang;WANG Neng;YIN Shu-yu(Hunan Provincial Communications Planning,Survey&Design Institute Co.,Ltd.,Changsha 410200,China)
出处 《水运工程》 北大核心 2020年第11期176-180,204,共6页 Port & Waterway Engineering
关键词 断层破碎带 固结灌浆 高压脉冲灌浆法 锚筋桩 fault fracture zone consolidation grouting high pressure pulse grouting anchor pile
  • 相关文献

参考文献3

二级参考文献19

  • 1杨延毅.加锚层状岩体的变形破坏过程与加固效果分析模型[J].岩石力学与工程学报,1994,13(4):309-317. 被引量:43
  • 2卢水林.构皮滩水电站水垫塘工程下游左护岸锚筋桩施工措施[J].中国科技信息,2007(14):63-64. 被引量:6
  • 3EGGER P.Ground improvement by passive rock bolts,experimental and theoretical studies,example[J].Memorie GEAM.1992,29(1):5-10.
  • 4CHEN S H,EGGER P.Elasto-viscoplastic distinct modelling of bolt in jointed rock masses[C]//Proc.Comp.Meth.and Adv.in Geomech,Wuhan (China):A.A.Balkema,1997,1985-1990.
  • 5SWOBODA G,MARENCE M.Numerical modelling of rock bolts in intersection with fault system[AC]//.In:Proc.Numerical Models in Geomechanics,NUMOG 5[C].Swansea (U.K.):Pineridge Press Ltd.,1992,729-738.
  • 6SHARMA K G,PANDE G N.Stability of rock masses reinforced by passive,fully-grouted bolts[J].Int.J.Rock Mech.Min.Sci.& Geomech,Abstr.1988,25(5):273-285.
  • 7SPANG K,EGGER P.Action of fully-grouted bolts in jointed rock and factors of influence[J].Rock Mech.Rock Engng,1990,23(2):201-229.
  • 8CHEN S H,PANDE G N.Rheological model and finite element analysis of jointed rock masses reinforced by passive,fully-grouted bolts[J].Int.J.Rock Mech.Min.Sci.& Geomech,Abstr.1994,31(3):273-277.
  • 9CHEN S H,EGGER P.Three dimensional elasto-viscoplastic finite element analysis of reinforced rock masses and its application[J].Int.J.for Num.and Anal.Meth.in Geomech,1999,23(1):61-78.
  • 10GOODMAN R E,TAYLOR R,BREKKE T L.A model for the mechanics of jointed rock[J].ASCE Journal of the Soil Mechanics and Foundation Division,1968,14:637-659.

共引文献19