复杂地质环境下全断面隧道掘进机快速施工技术 被引量:2

Rapid Construction Technology of Full-section Tunnel Boring Machine in Complex Geological Environment
下载PDF
导出
摘要 以巴基斯坦NJ水电站项目引水隧洞施工为例,对全断面隧道掘进机在喜马拉雅山脉区域的快速施工技术进行了研究。介绍了在喜马拉雅山脉区域复杂地质条件下全断面隧道掘进机的选型、设备优化、快速施工等内容,为同类地下工程实施积累了经验。 Taking the construction of diversion tunnel of NJ hydropower station in Pakistan as an example,the rapid construction technology of full-section tunnel boring machine in Himalayas is studied.The selection,equipment optimization and rapid construction of full-section tunnel boring machine under complex geological conditions in Himalayas are introduced.It has accumulated experience for similar underground projects.
作者 李林辉 LI Linhui(China Gezhouba Group No.3 Engineering Co.,Ltd.,Xi’an Shaanxi 710077,China)
出处 《建筑施工》 2020年第10期1945-1948,共4页 Building Construction
关键词 喜马拉雅山脉 全断面隧道掘进机不良地质 快速施工 Himalayas full-section tunnel boring machine unfavorable geology rapid construction
  • 相关文献

参考文献7

二级参考文献33

共引文献70

同被引文献12

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部