期刊文献+

在建地铁车站对既有电力隧道的影响研究

Study on Influence of Subway Station Under Construction on Existing Electric Power Tunnel
下载PDF
导出
摘要 以上海轨交14号线大世界站上跨西藏南路电力隧道工程为背景,对在建地铁车站对既有电力隧道的影响及相应的施工保护措施进行了研究。通过分析在建车站对电力隧道变形的控制难点,采取了土体加固、基坑分块实施及增设抗拔桩等相应的保护措施,并通过三维有限元分析了地铁动荷载对隧道沉降变形的影响,获得了相应的数值分析结果,经与同类型既有地铁车站的变形监测数据进行对比,证实数值分析结果与实测数据变形趋势一致,可为今后相似工程提供参考。 Based on the background of electric power tunnel project across South Xizang Road over Shanghai Metro Line 14 Dashijie Station,the influence of the subway station under construction on the existing electric power tunnel and the corresponding construction protection measures are studied.Through the analysis of the difficulties in the deformation control of electric power tunnel affected by the station under construction,the corresponding protection measures are taken,such as soil reinforcement,sectioned construction of foundation pit and addition of uplift piles.The influence of subway dynamic load on tunnel settlement is analyzed by 3D finite element method,and the corresponding numerical analysis results are obtained.Compared with the deformation monitoring data of the same type of existing subway stations,it is confirmed that the deformation trend of the numerical analysis results is consistent with the measured data.It can provide reference for similar projects in the future.
作者 颜超 唐中杰 史苏清 许光孝 YAN Chao;TANG Zhongjie;SHI Suqing;XU Guangxiao(Engineering General Institute of Shanghai Construction Group,Shanghai 201114,China;Shanghai Construction No.4 Group Co.,Ltd.,Shanghai 201103,China;Shanghai Shentong Rail Transit Research&Consultancy Co.,Ltd.,Shanghai 200070,China;Shanghai Construction Group Co.,Ltd.,Shanghai 200080,China)
出处 《建筑施工》 2020年第10期1949-1952,共4页 Building Construction
基金 上海建工集团股份有限公司集成示范类科研项目(18JCSF-28)。
关键词 隧道保护 地铁动荷载 变形控制 数值模拟 tunnel protection subway dynamic load deformation control numerical simulation
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部