东胜气田滚动建产期管网部署优化 被引量:4

Optimization of Pipeline Network Deployment during ProgressiveProduction Period in Dongsheng Gas Field
下载PDF
导出
摘要 由于东胜气田采用滚动开发的建设模式,建设节奏快,在未形成大规模标准井网部署情况下,易造成地面串接采气管网设计及建设调整改造工作量大,管网适应性低。为解决相应问题,东胜气田开展采气管网设计建设优化工作,形成了以“多井双站”串接、采气干管超前部署、管道敷设滚动设计为主的优化思路和改造措施,对标准化低压集输设计模式进行了补充完善,提高了东胜气田滚动建产期采气管网适应性,保障了气田快速上产。 During gas field progressive production period, a large-scale standard wellpattern deployment was not well developed, which made surface cascade gasproduction pipeline network has to be adjusted to meet capability and transformationdemand. A design optimization of gas production pipeline network was carried outthat included advanced deployment of gas production main pipe and pipeline layoutdesign, supplemented and improved standardized low-pressure gathering designmodel in construction production period of Dongsheng gas field. The improvedadaptability of gas production pipeline network guaranteed gas field is producingrapidly.
作者 彭杰 Peng Jie
出处 《石油规划设计》 2020年第6期29-31,43,62,共5页 Petroleum Planning & Engineering
  • 相关文献

参考文献6

二级参考文献31

共引文献43

同被引文献20

引证文献4

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部