湖南旺旺医院(二期)深基坑双笼户外电梯安装技术 被引量:2

Installation Technology of Double Cage Outdoor Elevator for Deep Foundation Excavation in Hunan Want Want Hospital (the Second Phase)
下载PDF
导出
摘要 为解决逆作法深基坑安装施工电梯问题,将施工电梯标准节整体拼装,标准节锚入底板以下桩内3m,标准节与桩空隙部位及时回填水稳料,保证了电梯竖向承载力及稳定性,标准节底部加设倒锥形转化装置及导向底座,采用导向定位器法施工,满足导轨架垂直度要求。工程应用表明,该技术先进,可靠性高,效益显著。此外,采用该技术提高了逆作施工效率,既缩短了施工工期,同时也确保了施工安全。 In order to solve the problem of installing the construction elevator in the deep foundation excavation by the top-down method,the standard section of the construction elevator is assembled as a whole,the standard section is anchored into the pile 3 m long below the base plate. The cement stabilized macadam in the gap between the standard section and the pile is backfilled in time,so as to ensure the vertical bearing capacity and stability of the elevator. At the bottom of the standard section,the invert conversion device and the guide base are added. The guide positioner method is used for construction,so as to meet the requirements of the vertical guide rail. The engineering application shows that the technology is advanced,reliable and effective. In addition,this technology can improve the efficiency of reverse construction,shorten the construction period and ensure the construction safety.
作者 胡昊璋 杨舜太 黄伟 高纲要 周建发 HU Haozhang;YANG Shuntai;HUANG Wei;GAO Gangyao;ZHOU Jianfa(Hunan Construction Engineering Group Co.,Ltd.,Changsha,Hunan 410004,China)
出处 《施工技术》 CAS 2020年第20期107-110,共4页 Construction Technology
基金 湖南省自然科学基金(2015JJ4106) 湖南建工集团科技计划项目(JGJTK2014-006)。
关键词 医院 深基坑 逆作法 施工电梯 安装 hospitals deep foundation excavation top-down method construction elevator installation