摘要
采掘衔接计划是煤矿统筹协调、关乎全局的系统性核心工作,文章先介绍了开元矿采区划分、采掘队组部署、煤层地质条件等情况,进一步对影响采掘衔接的主要原因进行了分析,在此基础上对采掘衔接进行了合理地优化调整,达到缓解衔接压力、保证安全生产的目的。
The mining connection plan is a systematic core work of overall coordination and overall situation of coal mine.This paper first introduces the mining area division,mining team deployment,coal seam geological conditions and other conditions of Kaiyuan mine,and further analyzes the main reasons affecting the mining connection.On this basis,the mining connection is optimized and adjusted reasonably,so as to relieve the pressure of connection and ensure safety of production.
作者
王鑫
Wang Xin(Yangquan Coal Industry Group Shouyang Kaiyuan Mining Co.,Ltd.,Shouyang Shanxi 045400)
出处
《山西冶金》
CAS
2020年第5期181-183,共3页
Shanxi Metallurgy
关键词
采掘衔接
优化调整
采区布置
mining connection
optimization and adjustment
mining area layout