OPGW光缆引下及接地施工工艺综述 被引量:3

Overview of Leading Down and Grounding Construction Technology of OPGW Optical Cable
下载PDF
导出
摘要 针对变电站导引光缆建设中设计不统一、施工工艺差异大、质量管控难度高等问题,对OPGW光缆引下和接地工艺进行研究,包括变电站门型架OPGW光缆引下及接续施工工艺、变电站女儿墙OPGW光缆引下及接续施工工艺、线路OPGW光缆引下及接续施工工艺3个主要组成部分。规范了OPGW光缆引下及接地施工工艺,提高了通信网运行安全性。 In allusion to the problems in the construction of substation guiding optical cable,such as non-uniform design,great difference in construction technology and difficulty in quality control,the leading down and grounding technology of the OPGW optical cable is studied,including three main parts:the leading down and connecting construction technology of the OPGW optical cable of substation portal frame,the leading down and connecting construction technology of the OPGW optical cable of substation parapet,and the leading down and connecting construction technology of the OPGW optical cable of transmission line.The construction technology of the OPGW optical cable is standardized,and the operation safety of the communication network is improved.
作者 展思杰 朱国朋 王立君 马恺 江颖洁 ZHAN Sijie;ZHU Guopeng;WANG Lijun;MA Kai;JIANG Yingjie(Information and Telecommunication Company of State Grid Shandong Electric Power Company,Jinan 250001,China)
出处 《国网技术学院学报》 2020年第5期38-41,共4页 Journal of State Grid Technology College
关键词 OPGW 光缆 施工工艺 OPGW optical cable construction technology
  • 相关文献

参考文献16

二级参考文献110

共引文献655

同被引文献22

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部