期刊文献+

岩土工程勘察中多孔抽水试验工作方法及基坑涌水量预测 被引量:1

Test Method of Porous Pumping in Geotechnical Engineering Investigation and Prediction of Water Inflow in Foundation Pit
下载PDF
导出
摘要 以江阴市澄星广场为背景,围绕岩土工程勘察中多孔抽水试验方法展开探讨,通过试验得出相关水文地质参数,并根据所得结果预测基坑涌水量,以便为后续降水设计与施工提供依据。 Taking Chengxing Square in Jiangyin City as the background,the paper discusses the test method of porous pumping in geotechnical engineering investigation,obtains relevant hydrogeological parameters through the test,and predicts the water inflow of foundation pit according to the results,so as to provide basis for subsequent dewatering design and construction.
作者 陈志俊 CHNE Zhi-jun(Jiangsu Provincial Zhongrui East China Institute of Architectual Design and Research Co.Ltd.,Wuxi 214431,China)
出处 《工程建设与设计》 2020年第23期47-49,共3页 Construction & Design for Engineering
关键词 多孔抽水试验 水文地质参数 涌水量预测 porous pumping test hydrogeological parameters water inflow prediction
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部