“软土刀盘”在上软下硬地层掘进施工技术研究 被引量:2

Research on Construction Technology of"Soft Clay Cutterhead"in Upper Soft Lower Hard Stratum
下载PDF
导出
摘要 以徐州地铁2号线9标文博园盾构丼一大龙湖站盾构区间上软下硬地层为背景,根据文大盾区间地质补勘资料,准确掌握了岩层侵入隧道的长度、高度。提出了对软土刀盘进行改造、岩层进行钻孔处理和控制施工参数,软土刀盘盾构机顺利穿越了上软下硬地层,为类似地层中盾构施工提供参考。 Based on the soft and hard stratum in the shield tunneling section of Xuzhou Metro Line 2 Bid 9 Wenboyuan Shield Tunnel to Dalonghu Station,the length and height of rock intrusion into the tunnel are accurately mastered according to the geological supplementary survey data of Wenda shield section.The soft soil cutterhead is reformed,the rock stratum is drilled and the construction parameters are controlled.The soft soil cutterhead shield machine passes through the upper soft stratum and the lower hard stratum smoothly,which provides a reference for shield construction in similar stratum.
作者 苏继峰 SU Ji-feng(China Railway 12th Bureaus Group Co.Ltd.,Taiyuan 030000,China)
出处 《工程建设与设计》 2020年第23期181-182,共2页 Construction & Design for Engineering
关键词 盾构施工 刀盘改造 钻孔处理 参数控制 shield construction cutterhead transformation drilling process parameter control
  • 相关文献

同被引文献3

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部