富水砂层中浅埋偏压大断面暗挖车站隧道方案适应性研究 被引量:2

ADAPTABILITY STUDY OF TUNNEL SCHEME FOR LARGE SECTION SUBMERGED EXCAVATION STATION WITH SHALLOW BURIED BIAS IN WATER-RICH SAND LAYER
下载PDF
导出
摘要 依托某地铁车站暗挖隧道施工为案例,对城市富水砂层中浅埋偏压大断面暗挖地铁车站的“先盾构后隧道”与“先隧道后盾构”2个方案进行浅析,主要介绍了2种方案的施工原则,并结合实际情况对2个方案的适应性进行分析,为此类相似案例提供参考。 Relying on the construction of a subway station undercutting tunnel as a case,the two schemes of"shield first,tunnel after"and"shield after tunne" for the shallow buried and biased large section underground excavated subway station in the urban water-rich sand layer were analyzed.This paper mainly introduces the construction principles of the two schemes,and analyzes the adaptability of the two schemes based on the actual situation,and provides a reference for selection of such similar cases.
作者 赵秋华 ZHAO Qiu-hua(Beijing Cida Engineering Management Consulting Co.,Ltd.,100840,Beijing,China)
出处 《建筑技术》 2020年第11期1365-1367,共3页 Architecture Technology
关键词 地铁 暗挖隧道 先盾后遂 先隧后盾 metro undercut tunnel shield tunneling before subsurface excavation subsurface excavation before shield tunneling countermeasure
  • 相关文献

参考文献1

二级参考文献4

共引文献4

同被引文献6

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部