基于远景规划的基站配套方案

Base station supporting Solution Based on long-term planning
下载PDF
导出
摘要 为了解决当前及可预见的将来基站建设面临的问题与挑战,需要采用灵活多变的基站配套建设方案。因此,分析移动运营商现有网络配套建设现状,根据可预见的将来网络系统基站建设和扩容需求,深入研究按需配套建设和基于远景规划的预留配套建设方案的实现方式及特点,并对比分析两种方案的优劣势及造价估算。通过预留建设一定的配套资源的方式,可为后续网络新增制式或扩容建设做好充分准备,提升建站效率,缩短建设周期,避免重复施工,降低建设投资。 In order to solve the problems and challenges faced by base station construction in the current and foreseeable future,Flexible and changeable solutions of supporting construction need be adopted.The current situation of existing network supporting construction of mobile operators was analyzed,The realization mode and characteristics of the construction solutions about the supporting on-demand and the reserved supporting construction based on the long-term planning were studied deeply,According to the base station construction and capacity expansion of wireless network system in the foreseeable future,the advantages&disadvantages and cost estimation of the two solutions were compared and analysed.It can make full preparation for the new system or expansion construction of wireless network in the future by reserving certain supporting resources.The efficiency of base station construction will be improved,construction period will be shorten,repeated construction will be avoided,and construction investment will be reduced.
作者 罗新军 彭文祥 LUO Xin-jun;PENG Wen-xiang(China Information Consulting&Designing Institute Co.,Ltd.,Nanjing 210019,China)
出处 《通信电源技术》 2020年第15期148-151,共4页 Telecom Power Technology
关键词 远景规划 按需配套 电源&光纤 多系统 long term plan supporting on demand power&fiber multi-system
  • 相关文献

参考文献3

二级参考文献33

  • 1Cisco Visual networking index: update, 2013-2018. http://www. global mobile data traffic forecast utions/collateral/ service-provider / visual-networking-index-vni / white paper_cl 1- 520862.html, 2014.
  • 2Wang C X, Haider F, Gao X Q, et al. Cellular architecture and key technologies for 5G wireless communication networks. IEEE Communications Magazine, 2014, 52(2): 122-130.
  • 3Boccardi F, Heath R W, Lozano A, et ol. Five disruptive technology directions for 5G. 1EEE Communications Magazine, 2014, 52(2): 74-80.
  • 4Kishiyama Y, Benjebbour A, Nakamura T, et ol. Future steps of LTE-A: evolution towards integration of local area and wide area systems. IEEE Wireless Communications, 2013, 20(1): 12-18.
  • 5Rost P, Bemardos C J, Domenico A D, et ol. Cloud technologies for flexible 5G radio access networks. IEEE Communications Magazine, 2014, 52(5): 68-76.
  • 6Demestichas P, Georgakopoulos A, Karvounas D, et ol. 5G on the horizon: key challenges for the radio access network. IEEE Communications Magazine, 2013, 8(3): 47-53.
  • 7Osserian A, Boccardi F, Braun V, et al. Scenarios for 5G mobile and wireless communications: the vision of the METIS project. IEEE Communications Magazine, 2014, 52(5): 26-35.
  • 8Bangerter B, Talwar S, Arefi R, et al. Networks and devices in 5G era. IEEE Communications Magazine, 2014, 52(5): 90-96.
  • 9Shuminoski T, Janevski T. Radio network aggregation for 5G mobile terminals in heterogeneous wireless networks. Proceedings of the llth International Telecommunication in Modern Satellite, Cable and Broadcasting Services, Serbia, 2013.
  • 105G愿景与需求白皮书.http://210.56.209.74/zh/documents/list/1,2014.

共引文献72

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部