交互式快速换绳在小庄煤矿主井换绳的应用研究

Application of Interactive Fast Rope Changing in Main Shaft of Xiaozhuang Coal Mine
下载PDF
导出
摘要 立井提升系统首绳更换是立井提升系统管理中一项工作量大、工作条件艰难、工作风险大的关键施工工作。传统的首绳更换作业通常需要3~5 d,而采用交互式快速换绳则只需要8~10 h便可完成,本文结合我矿更换主井提升2#系统更换首绳和悬挂装置施工作业,介绍了交互式快速换绳的应用及工作要点,以期进一步提高小庄煤矿主井换绳效率。 The first rope replacement of shaft hoisting system is a key construction work with heavy workload,difficult working conditions and high risk in the management of shaft hoisting system.The traditional first rope replacement operation usually takes 3~5 days,while the interactive fast rope replacement only takes 8~10 hours.This paper introduces the application and key points of interactive fast rope replacement based on the replacement of head rope and suspension device of hoisting 2 system in main shaft of Xiaozhuang coal mine,so as to further improve the efficiency of rope replacement in Xiaozhuang coal mine.
作者 刘昌国 董红涛 刘坤亮 LIU Changguo;DONG Hongtao;LIU Kunliang(Shaanxi Binchang Xiaozhuang Mining Co.,Ltd.,Xianyang Shaanxi 713500)
出处 《智能建筑与工程机械》 2020年第6期111-112,共2页 Intelligent Building and Construction Machinery
关键词 立井提升 首绳更换 交互式 快速 shaft lifting first rope replacement interactive fast
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部