浅埋近距离煤层区段煤柱下双巷布置可行性研究 被引量:7

Research on feasibility of double-roadway layout below coal pillar in shallow and close coal seam
下载PDF
导出
摘要 针对神东矿区某煤矿浅埋近距离煤层工作面协调开采时下煤层工作面双巷布置的可行性问题,采用数值模拟、物理模拟及现场实测方法,研究了上覆35 m宽区段煤柱下巷道的变形及塑性区破坏特征。结果表明:随着埋深增加,煤柱下双巷变形量增大,埋深为300 m时巷道顶底板累计移近量达2.5 m,巷道变形破坏严重,且下煤层双巷之间的煤柱塑性区完全贯通,煤柱存在失稳现象;考虑到该矿三盘区实际埋深为100 m左右,此时煤柱下双巷受多次采动影响后的顶底板累计移近量模拟值为180 mm、实测值为32 mm,两帮累计移近量模拟值为118 mm、实测值为24 mm,巷道围岩塑性区破坏范围仅为0.5 m,巷道总体保持良好。研究验证了该矿三盘区特定埋深条件下在区段煤柱下布置双巷是可行的,满足工作面安全高效生产需要。 For the feasibility of double-roadway layout in hypogynous coal seam in A Coal Mine of Shendong mining area when working faces in shallow and close coal seam are synchronously mined,roadway deformation and plastic zone failure characteristics below an overburden 35 m wide coal pillar are researched by use of numerical simulation,physical model and field measurement.The results indicate that the greater the cover depth is,the larger the roadway deformation is.Especially,cumulative displacement between roof and floor reaches 2.5 m with serious roadway deformation when cover depth is 300 m,and plastic zones of coal pillar between the double roadways in hypogynous coal seam completely link up,which shows unstability of the coal pillar.Considering the actual cover depth is only about 100 m in No.3 panel of the mine,the simulated cumulative displacement between roof and floor of roadway below the coal pillar after multi-mining is 180 mm and the actually measured one is 32 mm,the simulated cumulative displacement between two sides is 118 mm and actually measured one is 24 mm,and plastic zone failure scope of roadway surrounding rock is only 0.5 m,which is stable on the whole.The research verifies that double-roadway layout below coal pillar in No.3 panel is feasible in some cover depths to satisfy requirements of safe and efficient production in working face.
作者 吕情绪 LYU Qingxu(Coal Technology Research Institute, Shenhua Shendong Coal Group Co., Ltd., Shenmu 719315, China)
出处 《工矿自动化》 北大核心 2020年第11期41-45,共5页 Journal Of Mine Automation
关键词 煤炭开采 近距离煤层 区段煤柱 双巷布置 围岩稳定性 巷道变形 塑性破坏 coal mining close coal seam coal pillar double-roadway layout stability of surrounding rock roadway displacement plastic failure
  • 相关文献

参考文献12

二级参考文献109

共引文献253

同被引文献72

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部