期刊文献+

国外某金属矿山基建投产达产过程分析 被引量:2

Analysis on the process of construction and into production reached capacity of a mine abroad
下载PDF
导出
摘要 文中介绍了国外某金属矿山的基建、投产、达产的各个阶段及过程节点,分析了其与国内矿山建设中基建投产达产的不同之处。国外矿山全生命周期中基建期通风设计组织与实践,做到了施工环境友好和谐,国内矿山可以借鉴;同时对国外建设模式更适用于何种资源禀赋的矿山开发给出了建议。 This paper introduces the stages and process nodes of the construction,operation and production of a metal mine abroad,and analyzes the differences between the construction,operation and production of a metal mine in China.In the whole life cycle of foreign mines,the ventilation design organization and practice in the construction period achieve a friendly and harmonious construction environment,which can be used for reference by domestic mines;and some suggestions on what kind of resource endowment of mine development is more suitable for foreign construction mode are given.
作者 刘国栋 LIU Guodong
出处 《中国矿山工程》 2020年第5期15-18,共4页 China Mine Engineering
关键词 矿山基建 开拓斜井组 生产斜井组 mine infrastructure development inclined group production inclined group
  • 相关文献

同被引文献5

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部